Earthworks and civil engineering · 2025
Paving at the Port of Douala for AGL
A port yard rebuilt end to end: area fenced off, stripped by excavator, formation prepared, then paved to meet the existing walkways, on a working port site.
Scope of work
Stripping · Formation · Paving
Location
Port of Douala
Period
2025
The site in pictures






Contact
Tell us about your project
Tell us what you want to build and we will call you back. The first conversation and the site visit commit you to nothing.


