Earthworks and civil engineering · 2025

Paving at the Port of Douala for AGL

A port yard rebuilt end to end: area fenced off, stripped by excavator, formation prepared, then paved to meet the existing walkways, on a working port site.

Scope of work

Stripping · Formation · Paving

Location

Port of Douala

Period

2025

The site in pictures

The yard before work, fenced off
The yard before work, fenced off
Stripping by excavator
Stripping by excavator
Work area marked along the drain
Work area marked along the drain
The team levelling the formation
The team levelling the formation
Formation ready for the pavers
Formation ready for the pavers
Meeting the existing paving
Meeting the existing paving

Contact

Tell us about your project

Tell us what you want to build and we will call you back. The first conversation and the site visit commit you to nothing.

Contact+237 694 749 979